Terrell logo Visit website

Arboretum

CUSTOMER
WO2
PROJECT LOCATION
Nanterre, Paris, France
PROJECT YEAR
2024
SECTOR
Offices/Tertiary
SERVICES
  • Structural Engineering

Scope

Arboretum is a campus of office buildings designed to state of the art, ultra-low carbon standards of construction both in terms of embodied and operational carbon.

The 125 000m² scheme is the largest CLT construction project in Europe and comprises 5 new buildings and 2 repurposed industrial buildings connected by walkways and set within a 9-hectar park.


The key aim for this large-scale project was to break away from a traditional steel and concrete structure by proposing an efficient timber structure that would harness carbon in an aesthetically pleasing design with exposed timber structural elements.


Approach

Our approach was driven by the need to rationalise the use of timber, concrete or steel for individual elements of the design.

Key design criteria included meeting the required standards of acoustic performance, fire safety and architectural quality. To meet these requirements, the ground floor level, which included communal areas and restaurants etc., was designed using reinforced concrete which enabled the positioning of the transfer slab there. Similarly, reinforced concrete was used for vertical circulation cores to maintain rigidity for the stability of the buildings and for floors supporting vibrating machinery. All floors above ground level use glulam post-and-beam with exposed CLT wood slabs.

Outcome

This highly technical project presented many challenges and required a complex, specialised design process. The resulting construction is groundbreaking and uses over 25,000m³ of glulam and CLT.

The challenges of meeting decarbonisation targets were met by drastically limiting the use of steel, in particular by using a system of timber beams at sill level, aligned with CLT undersides and no visible fasteners.


Ultra-low carbon standards were met with a BREEAM certification awarded at Excellent level. Arboretum is the largest tertiary complex to be awarded the French certifications of BBCA (Bâtiment Bas Carbone) label at the Excellent level and E2C2 of the E+C- label.


Terrell Logo

Terrell

France

Since its creation in 1982 in Paris, the Terrell group has become a leading multi-disciplinary building engineering consultancy, with headquarters in France and offices in the UK and the Middle East.

Partner profile

Project spotlight

Banská Štiavnica, Slovakia

Viacúčelový športový areál so základnou školou Guliver

  • Structural Engineering

Copenhagen, Denmark

Natural History Museum of Denmark

The development of the new Natural History Museum of Denmark is one of the largest...

  • Building Services
  • Structural Engineering

Boden, Sweden

H2GreenSteel 

Green steel and green hydrogen will play a crucial role in a decarbonized future.

  • Project Management
  • Structural Engineering

Vaasa, Finland

Old Vaasa’s Hospital

A new 48-patient hospital building to be built on the hospital grounds.

  • Building Services

Siemianowice Slaskie, Poland

Rolling Mill Construction

Cognor S.A. Ferrostal Labedy is undertaking a project to build a new rolling mill.

  • Civil Engineering
  • Project Management

Glasgow, Scotland

Statkraft, Glasgow

Statkraft are Europe’s largest renewable energy producer and a global company in energy market operations.

  • Project Management