- Structural Engineering
Scope
Primary school, gymnasium and swimming pool (usable floor area 5333 m²), sports field.
Approach
Architecture and construction design, structural analysis and structural engineering drawings (construction set), MEP systems coordination.
Outcome
The project was completed in 2021.